This manual is the operating manual for the PQC power quality controller, which mainly introduces the functions, installation, connection, and use of the PQC power quality controller.
The Schrack PQC Power Quality Controller user manual is written for persons who install, connect, commission and operate the PQC. It covers safety instructions, intended and improper use, technical data, instrument description, mounting and electrical installation.
The manual also describes commissioning and automatic identification, menu overview and main menu operation, settings, instrument versions, maintenance, decommissioning, storage, disposal, troubleshooting and scope of supply.
| Measured parameters | Voltage, current and frequency |
|---|---|
| Measurement phases | L1 or all three phases L1, L2 and L3, depending on instrument version |
| USB port | Service interface for updating PQC firmware only |
| Installation location | Stationary, weather-protected control cabinets and enclosures indoors |
The PQC controls reactive power in stages using its output relays.
Installation, commissioning, modifications and retrofitting may only be carried out by appropriately qualified personnel.
It is intended for stationary, weather-protected control cabinets and enclosures located indoors.
It is a service interface provided solely for updating the PQC firmware; users must not connect other cables or devices.