Erie Water Works Planning and Design Guide for New Water Services

Erie Water Works (EWW) Planning and Design Guide for New Water Services


Erie Water Works Planning and Design Guide for New Water Services - cover page
Brand
Erie Water Works
Category
Other
Document type
Other
Language
English
Pages
1
File format
PDF
File size
445 KB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
CF0A523E5075295DD46C54E6176E1F03

About this manual

Erie Water Works (EWW) published this Planning and Design Guide for New Water Services within its water distribution system. It is issued by the EWW Engineering Services Department in Erie, Pennsylvania.

The guide outlines planning steps such as verifying water availability and requesting pressure information, followed by design requirements, required submittals and approvals, installation of EWW taps, and customer service line installation and inspection.

What's inside

  • Planning
  • Design
  • Required Submittals & Approvals
  • Installation of Erie Water Works Taps
  • Customer Service Line Installation and Inspection

Frequently asked questions

How can I verify that public water is available?

Call an EWW Engineering Department representative.

When must water meters be set by EWW?

EWW must set water meters prior to or at the end of the construction phase.

How far in advance must an inspection be scheduled?

Call EWW Engineering staff to schedule an inspection at least 24-hours in advance.

What is required for all taps prior to installation by EWW?

Payment in full is required for all taps prior to installation by EWW.