This manual introduces the installation, operation and maintenance methods of KSTAR BluE-H5/H3 energy storage system.
This manual provides installation, operation, and maintenance instructions for the Kstar BluE-H5/H3 Energy Storage System, which can be applied in DC-coupled, AC-coupled, and hybrid-coupled systems. It is published by Shenzhen Kstar Science & Technology Co., Ltd.
Topics include system introduction, safety precautions, parts list, installation, switch on/off procedures, EMS setup, alarm and error code diagnosis, quality assurance, and routine maintenance.
| Operating temperature | Do not install below -10°C or over 50°C |
|---|---|
| Humidity | Do not install where humidity is over 90% |
| Battery type | Lithium Iron Phosphate Battery |
It can be applied in DC-coupled, AC-coupled, and hybrid-coupled systems.
Do not install or operate the system if moisture has penetrated it.