Civil Aviation Express Wrapping Film Procurement Requirement Description

Civil Aviation Express Wrapping Film Demand Description


Civil Aviation Express Wrapping Film Procurement Requirement Description - cover page
Brand
民航快递
Category
Other
Document type
Other
Language
Chinese
Pages
1
File format
PDF
File size
169 KB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
862D51C3AF956115C0E49A82CF2D5A07

About this manual

This is Appendix 2 of a procurement document from Civil Aviation Express (民航快递): a demand description for stretch/wrapping film (缠绕膜). It states the product name, an annual demand of about 25,000, the PE material, and three product specifications covering hand-use and machine-use film with their widths, lengths, thicknesses and elongation values.

The document also sets out the service scope (production or sales, distribution and transport), the ordering frequency per style, supplier requirements such as lead time within 15 days of order (7 days for Shenzhen) and VAT invoicing, the plan to select two cooperating suppliers with a 60%–70% / 30%–40% share split, and the delivery cities across six regions, 31 cities in total. This manual is written in Chinese.

What's inside

  • 产品名称
  • 年需求量
  • 产品规格
  • 产品材质
  • 产品样式
  • 服务内容
  • 采购频次
  • 服务要求
  • 送货地点

Specifications

Product name民航快递缠绕膜
Annual demand约2.5万
MaterialPE
Available specifications500MM*600M, 500MM*3000M, 450MM*300M (thickness 12μm / 20μm)
Hand-use film (style 1)500MM*600M, thickness 12μm, elongation not less than 300%
Machine-use film (style 2)500MM*3000M, thickness 12μm, elongation not less than 350%
Hand-use film with adhesive (style 3)450MM*300M, thickness 20μm, single-side glue, elongation not less than 300%
Delivery lead timeWithin 15 days from order; within 7 days for Shenzhen
Delivery cities31 cities in total

Frequently asked questions

What material is the wrapping film made of?

The film is made of PE material.

How large is the annual demand?

The annual demand is about 25,000.

What is the required delivery lead time?

Arrival must be controlled within 15 days from the order date, and within 7 days for supply to Shenzhen.

How many cooperating suppliers will be selected?

Two suppliers will be selected: the first with a 60%–70% share and the second with 30%–40%.

Download PDF (169 KB)