SMG2000B digital phase-voltage clamp meter is a multi-function instrument designed specifically for field testing. It has the characteristics of high accuracy, high stability, low power consumption and easy operation.
This is the Chinese product manual for the Hezi SMG2000B digital dual-clamp phase volt-ampere meter (数字式双钳相位伏安表), published by Wuhan Hezi Power Equipment Co., Ltd. The manual introduces the instrument as a portable field tester that measures AC voltage and AC current without opening the circuit under test, and measures phase between two voltages, two currents, or voltage and current; power factor, power, three-phase sequence, transformer connection groups and inductive/capacitive circuits are obtained indirectly. It lists safety requirements, technical specifications, structure, operating steps, battery management and the packing list, and ends with test wiring reference diagrams.
The document explains the 9 V DC battery supply, the large backlit LCD, the HOLD, LAMP, ON and OFF keys, and the four phase measurement relationships U1U2, I1I2, U1I2 and I1U2. Operating sections give the switch positions and lead or clamp connections for phase measurement, AC current and leakage current measurement, AC voltage measurement, inductive/capacitive circuit identification and three-phase three-wire and four-wire phase sequence checks, followed by battery replacement steps and a list of included accessories. This manual is written in Chinese.
| AC voltage ranges | 0~20V / 200V / 600V |
|---|---|
| AC current ranges | 0~200mA / 2A / 20A |
| Phase range, resolution and basic error | 0~360°, 1°, ±1° |
| LCD size | 70mm×62mm (display area 64mm×54mm) |
| Dimensions (length × width × thickness) | 196mm×92mm×54mm |
| Weight of main unit | about 550 g with battery |
| Power supply | DC9V alkaline battery (1.5V AA × 6) |
| Sampling rate | about 3 times per second |
| Clamp jaw size | φ7.5mm×13mm |
| Test lead length | 1.5 m (current clamp lead 2 m) |
| Voltage input impedance | 2MΩ on each voltage range |
| Automatic power off | about 15 minutes after switching on |
| Continuous battery operating time | about 40 hours with backlight on |
| Working temperature and humidity | -10℃~40℃, below 80%Rh |
It uses a DC9V alkaline battery consisting of six 1.5V AA cells. The manual notes the low-battery symbol appears when the voltage falls below 7.2V.
Yes. About 15 minutes after it is switched on, the meter turns itself off to reduce battery consumption.
Set the rotary switch to U1I2, feed the circuit voltage into U1 and the circuit current into I2; a phase reading in the 0–90° range means an inductive load, and 270–360° means a capacitive load.
With the switch at U1U2, connect phase A to the red U1 jack, phase B to the red U2 jack and the neutral to both black jacks; about 120° indicates positive sequence and about 240° negative sequence.