Zhuoya GM-25kV High Voltage Digital Megohmmeter User Manual

GM-25kV adjustable high voltage digital megohmmeter manual, introduces the characteristics, use methods, safety precautions of the product


Zhuoya GM-25kV High Voltage Digital Megohmmeter User Manual - cover page
Brand
Zhuoya
Category
Industrial Supply
Document type
User Manual
Language
Chinese
Pages
17
File format
PDF
File size
1.3 MB
Published
29 October, 2023
Updated
29 October, 2023
MD5 checksum
4B7D8742E866C7ED359056A1E2D2A1EC

About this manual

The Zhuoya GM-25kV adjustable high voltage digital megohmmeter is designed for testing electrical insulation resistance characteristics in high-voltage substations and power plants. It features fixed and adjustable voltage outputs, allowing for smooth regulation to required levels, and is suitable for testing large capacitors and inductors under strong interference conditions.

The device operates using a ratio meter method with dual-integration digital voltage conversion, offering high anti-interference capabilities. Key features include a wide measurement range from 0.01MΩ to 1999GΩ, a maximum output voltage of 25kV, and a short-circuit current of over 10mA. It includes audible and visual alarms for timing and resistance readings below the lower limit of the range. This manual is written in Chinese.

What's inside

  • Safety Precautions
  • Product Overview
  • Executive Standards
  • Functional Advantages
  • Technical Parameters
  • Design Principle
  • Panel Structure
  • Operation Guide
  • Precautions
  • Troubleshooting

Specifications

Measurement Range0.01MΩ~1999GΩ
Output Voltage0.01 ~ 25kV
Anti-interference Capability2mA (50Hz)
DisplayThree 3.5-digit LCD
Power SupplyDC 12V (10x 1.2V/2000mAh NiMH)
Dimensions315×240×155mm
Weight5.5kg

Frequently asked questions

How long does it take to fully charge the battery?

It takes approximately 6 to 8 hours to fully charge the battery.

What is the measurement accuracy for the 2000GΩ range?

The accuracy for the 2000GΩ range is ±(20%+10 digits).

What safety precautions should be taken before operation?

Ensure the equipment is effectively grounded to prevent electric shock and interference.

Download PDF (1.3 MB)

More Zhuoya Manuals


View all Zhuoya manuals →