Yihe BH5 Series Smart Toilet Installation and User Manual

This PDF file is about TOTO toilet installation instructions, introduces the functions and characteristics of the toilet, installation methods, precautions and other content.


Yihe BH5 Series Smart Toilet Installation and User Manual - cover page
Brand
Yihe
Category
Other
Document type
User Manual
Language
Chinese
Pages
2
File format
PDF
File size
1.4 MB
Published
29 October, 2023
Updated
29 October, 2023
MD5 checksum
905FEDAA67B4183209F725C4B8815A33

About this manual

This document is the user manual for the Yihe smart toilet, covering installation procedures, operational instructions for various cleaning and drying functions, and battery maintenance. It details how to install the water supply filter, connect the power, and operate the remote control and on-board buttons for features like bidet washing, air drying, and seat heating. This manual is written in Chinese.

What's inside

  • Product Introduction
  • Package Contents
  • Installation Precautions
  • Water Pressure Confirmation
  • Installation Steps
  • Remote Control Installation
  • Power Connection
  • Function Operation
  • Battery Installation and Replacement
  • Troubleshooting

Specifications

Minimum Dynamic Working Water Pressure0.14MPa
Maximum Static Water Pressure0.75MPa
Water Flow RequirementOver 3 liters in 10 seconds
Power Supply220V AC
Battery TypeCR-P2

Frequently asked questions

What is the minimum water pressure required for installation?

The minimum dynamic working water pressure is 0.14MPa.

How can I check if the water pressure is sufficient without a gauge?

Open the valve and measure the water flow; it must exceed 3 liters in 10 seconds.

What type of battery is used in the battery box?

The product uses a CR-P2 lithium battery.

How long must I wait after applying glass glue before using the toilet?

You must wait 48 hours after applying glass glue before using the product.

Download PDF (1.4 MB)

More Yihe Manuals


View all Yihe manuals →