Con Edison Version 5 Solar Photovoltaics Guide

guide to solar photovoltaic projects


Con Edison Version 5 Solar Photovoltaics Guide - cover page
Brand
Con Edison
Category
power system
Document type
Other
Language
English
Pages
20
File format
PDF
File size
1.5 MB
Published
27 October, 2023
Updated
27 October, 2023
MD5 checksum
7E86C00049FDCDD63F903414919D77BA

About this manual

This guide from Consolidated Edison Company of New York (Con Edison) provides informational guidance for customers installing or upgrading photovoltaic (PV) generators up to 5 MW-AC that connect to Con Edison's electric distribution system in New York City and Westchester County. It aligns with the New York State Standardized Interconnection Requirements (SIR) and covers high-level details of the interconnection process, typical steps, challenges, and technical solutions for PV projects.

The document describes Con Edison's grid infrastructure, including radial and network distribution systems, and explains technical considerations for interconnecting PV systems based on grid type and project size. It addresses SCADA equipment, interconnection processes, rate classifications, and pairing solar with other technologies, while emphasizing that the guide does not substitute for applicable laws, codes, or the SIR.

What's inside

  • Introduction
  • About Con Edison's Electrical Grid
  • Technical Interconnection Considerations for PV System
  • SCADA Equipment Details
  • Interconnection Process
  • Rates and Service Classifications
  • Solar Paired with Other Technologies
  • Contacts for Further Questions
  • Definitions and Acronyms

Frequently asked questions

What is the maximum PV system capacity covered by this guide?

The guide covers photovoltaic generators up to 5 MW-AC connected to Con Edison's distribution system.

What are the two types of electric distribution grid systems described?

The two types are radial grids and network grids, which differ in configuration and reliability characteristics.

What standard does this guide align with for interconnection requirements?

The guide aligns with the New York State Standardized Interconnection Requirements (SIR), May 2022 version.

Who is responsible for the proper design and safety of the customer's PV installation?

Responsibility for proper design, operation, maintenance, and safety rests solely with the customer.

Download PDF (1.5 MB)