Instruction Manual
This manual provides instructions for servicing the Oasis Engineering IB108 Inline Breakaway. It details the required tools, safety precautions, and the specific sequence for disassembling the unit to inspect internal components like O-rings and poppets for damage or debris. The document emphasizes the importance of using specific tools and lubricants during the process.
| Minimum flexible hose length | 1 Metre (3 feet) |
|---|---|
| Post force requirement | 2000N/450lb |
| End cap torque | 30Nm |
| End cap final torque | 120Nm |
| Adaptor torque | 280Nm |
Silicone grease (Rocol MX22 or similar) should be applied to all O-rings.
Vent Poppet Thread Locking Sealant - Loctite 243 (Blue - medium strength) or similar is recommended.