This document describes the methods for installing high-rise irrigation systems in high tunnels.
This manual provides detailed instructions for installing an overhead irrigation system in high tunnels, tailored to specific equipment and site conditions. It covers tools and parts needed, supply line preparation, hanging assembly, drain lines, header installation, flushing, sprinkler heads, operation, and maintenance. The guide is based on manufacturer recommendations and real-world installations at The Ohio State University’s Horticulture Unit 1.
The system uses components like ¾” low-density PE tubing, SpinNet sprinklers, and Netafim-designed parts. Installation typically takes 3–4 hours for two people, with safety and precision emphasized to avoid costly mistakes. The guide also includes references to manufacturer manuals and additional resources for further learning.
The installation and documentation process requires between 3-4 hours of labor to complete.
You should make a mark every 3 feet to indicate where to punch holes for the hanging sprinkler assemblies.
There are 13 marks required from 6 feet to 42 feet for the example 48-foot high tunnel.