The Ohio State University Installing an Overhead Irrigation System in a High Tunnel User Manual

This document describes the methods for installing high-rise irrigation systems in high tunnels.


The Ohio State University Installing an Overhead Irrigation System in a High Tunnel User Manual - cover page
Brand
The Ohio State University
Document type
User Manual
Language
English
Pages
39
File format
PDF
File size
18.3 MB
Published
27 October, 2023
Updated
27 October, 2023
MD5 checksum
6CC91C8A182828CDDDF7A16EFFD187ED

About this manual

This manual provides detailed instructions for installing an overhead irrigation system in high tunnels, tailored to specific equipment and site conditions. It covers tools and parts needed, supply line preparation, hanging assembly, drain lines, header installation, flushing, sprinkler heads, operation, and maintenance. The guide is based on manufacturer recommendations and real-world installations at The Ohio State University’s Horticulture Unit 1.

The system uses components like ¾” low-density PE tubing, SpinNet sprinklers, and Netafim-designed parts. Installation typically takes 3–4 hours for two people, with safety and precision emphasized to avoid costly mistakes. The guide also includes references to manufacturer manuals and additional resources for further learning.

What's inside

  • About Overhead Irrigation in High Tunnels
  • Tools & Parts Inventory
  • Overhead Supply Line Preparation
  • Overhead Supply Line & Hanging Assembly Installation
  • Drain Out Line Installations
  • Header Assembly Installation
  • System Flushing
  • Sprinkler Head Installation
  • System Operation
  • Maintenance & Winterization

Frequently asked questions

How long does it take to install and document an overhead irrigation system in a high tunnel?

The installation and documentation process requires between 3-4 hours of labor to complete.

What is the recommended spacing for punching holes in the supply line tubing?

You should make a mark every 3 feet to indicate where to punch holes for the hanging sprinkler assemblies.

How many marks are needed for the tubing in the example high tunnel shown?

There are 13 marks required from 6 feet to 42 feet for the example 48-foot high tunnel.

Download PDF (18.3 MB)