SMARTLINK Flow Meter Quick Start Guide

This document is a quick start guide for SMARTLINK flow meters, which mainly introduces installation and debugging of flow meters


SMARTLINK Flow Meter Quick Start Guide - cover page
Brand
Smartlink
Document type
Quick Start Guide
Language
English
Pages
10
File format
PDF
File size
377 KB
Published
27 October, 2023
Updated
27 October, 2023
MD5 checksum
1D9B9DAC86DF82F101C24674F80FE2D3

About this manual

This guide provides step-by-step instructions for verifying product calibration, mechanical installation, and electrical wiring of the SMARTLINK Flow Meter. It covers piping requirements, flow body orientation, sensor insertion, and terminal connections for both AC and DC models. The guide also explains relay outputs and input configurations for remote testing and status monitoring.

The document does not cover detailed specifications, installation, operating, or maintenance procedures, focusing instead on getting the meter up and running quickly.

What's inside

  • Purpose
  • Product Verification
  • Mechanical Installation
  • Electrical Installation
  • Wiring Terminals
  • Input Power and Grounding
  • Loop Power
  • Flow Output
  • Ratio Output
  • Flow Input

Frequently asked questions

What are the minimum straight pipe requirements for installation?

The meter requires a minimum of 5 diameters upstream or 12 inches, whichever is greater, and 3 diameters downstream or 12 inches, whichever is greater.

How do you change the LCD orientation after shipment?

Turn the power off, remove the four screws retaining the LCD electronics module, rotate the module 180°, and plug it back into the main board.

What is the maximum ON current for the external relay coils?

Each relay output must be connected to an external 24VDC relay coil with a maximum ON current of 100mA.

Download PDF (377 KB)

More Smartlink Manuals


View all Smartlink manuals →