This document is a quick start guide for SMARTLINK flow meters, which mainly introduces installation and debugging of flow meters
This guide provides step-by-step instructions for verifying product calibration, mechanical installation, and electrical wiring of the SMARTLINK Flow Meter. It covers piping requirements, flow body orientation, sensor insertion, and terminal connections for both AC and DC models. The guide also explains relay outputs and input configurations for remote testing and status monitoring.
The document does not cover detailed specifications, installation, operating, or maintenance procedures, focusing instead on getting the meter up and running quickly.
The meter requires a minimum of 5 diameters upstream or 12 inches, whichever is greater, and 3 diameters downstream or 12 inches, whichever is greater.
Turn the power off, remove the four screws retaining the LCD electronics module, rotate the module 180°, and plug it back into the main board.
Each relay output must be connected to an external 24VDC relay coil with a maximum ON current of 100mA.