This work instruction is a guide for conducting United States Coast Guard Initial Certificate of Compliance Examinations on Foreign Passenger Vessels. It provides clear guidance and information for U.S. Coast Guard Foreign Passenger Vessel Examiners (FPVEs), shipyards, owner/operators, and third-party stakeholders in the preparation and execution of Initial Certificate of Compliance (ICOC) Examinations.
USCG Work Instruction MPS-WI-CSNCOE-05(03), revised 31 July 2023, provides guidance for U.S. Coast Guard Foreign Passenger Vessel Examiners, shipyards, owner/operators, and third-party stakeholders in preparing for and executing Initial Certificate of Compliance (ICOC) examinations. It states that the guidance does not limit FPVEs from expanding or modifying the examination scope where there are reasonable grounds that do not deviate from USCG or IMO requirements.
The document lists references and describes the applicability of the ICOC exam. It then describes the exam components in order: Concept Review, Plan Review, and Structural Fire Protection Examination (SFP Exam), including required plan submissions, general vessel information, structural fire protection plans, means of escape diagrams, and preliminary stability calculations when requested.
An Initial COC Exam is required for new or existing vessels that intend to embark passengers from a U.S. port for the first time, along with other cases listed in the document.
The MSC conducts the concept review during the design phase for novel ship arrangements or unique designs that involve interpretations of SOLAS, equivalencies, or exemptions.
The MSC requires at least 30 days' notice before the proposed concept review meeting date, and the request must include an agenda.
Submitters should make plan submissions at least 6 months in advance to allow MSC to complete plan review before the SFP and Initial Exam.