Valley GPS Installation Manual
This installation manual from Valmont Industries describes how to install the Valley GPS Pivot Position on a pivot irrigation machine equipped with an ICON control panel running software version 1.01 or later. It includes optional PLC End Gun 3 and 4 coverage, safety information, a quick install guide, and field install and wiring diagrams.
The manual covers the tools needed, lockout/tagout procedures, installing the Power Line Carrier in the control panel, setting dip switches, temporary and permanent GPS installation, setup methods for ICON5/ICONX and ICON10/ICON1 panels, testing, and troubleshooting with GPS error codes and tables.
| Compatible control panel software | Version 1.01 or later |
|---|---|
| Typical GPS mounting location | Over the last regular drive unit (LRDU), within 5 ft (1524 mm) of the last tower box or Precision Corner LRDU control panel |
| Mounting hardware | One 5/16 in X 2 in cap screw, two 5/16 in flat washers, one 5/16 in lock nut |
The Valley GPS Pivot Position is for ICON control panels running software version 1.01 or later.
It is typically installed over the last regular drive unit, within 5 ft (1524 mm) of the last tower box or Precision Corner LRDU control panel.
The manual lists a small straight screwdriver, 1/2 in wrenches, 9/16 in wrenches, an adjustable wrench, pliers, and a wire cutter/stripper.