This document describes the steps and precautions for installing cabinets.
This guide gives general steps for installing Hampton Bay Designer Series frameless kitchen cabinets. It covers tools required, layout and planning, cabinet installation order, leveling cabinets to the high spot in the floor, fastening cabinets to the wall and to each other, installing fillers and trim, hinge removal and reinstallation, and adjusting doors and drawers. It also warns that kitchen installations typically involve gas, high voltage wiring, plumbing, and mechanical details such as heating and AC vents.
The document ends with a limited lifetime warranty from RSI Home Products, Inc. for Hampton Bay Designers Series products. The warranty covers substantial defects in materials and workmanship under normal home use for the original consumer purchaser and lists exclusions such as improper installation, misuse, normal wear and tear, and incidental or consequential damages.
| Cabinet construction | Frameless construction |
|---|---|
| Base cabinet layout line | 34 ½ inches above the high spot in the floor |
| Stud spacing | Usually every 16 inches center to center |
| Cabinet width increments | 3 inches |
| Wall fastening screws | #8 x 2-1/2 inch flat head screws |
| Cabinet-to-cabinet screws | #7 x 1-1/8 inch flat head screws |
Use a level to find the high spot in the floor before drawing the 34 ½-inch layout line.
#8 x 2-1/2-inch flat head screws are used through a single layer of drywall into wood studs.
They are screwed together with #7 x 1-1/8-inch flat head screws.
RSI Home Products warrants kitchen cabinets and accessories against substantial defects in materials and workmanship under normal home use for the life of the product.