This document is the HDS-NT Press Brake installation guide, which introduces the environmental conditions, power supply requirements, machine installation, machine location, transportation, foundation, cleaning, hydraulic oil supply, removing shipping brackets, installing stopper fingers, moving rear guard, supplying electric power, connecting power cable, checking electrical connections, zero-returning, leveling, paralleling upper and lower beams, checking movement of each axis, and final checks.
The guide covers installation of the Amada HDS-NT press brake in the HDS8025, HDS1030, and HDS1303 models. It describes environmental conditions and power requirements, including a 200/220 V AC, 3-phase, 50/60 Hz supply, and gives floor-space and clearance requirements for the installation location.
It also covers carrying the machine with a crane or rollers, preparing the foundation, cleaning, supplying hydraulic oil, removing shipping brackets, installing stopper fingers, moving the rear guard, connecting power, checking wiring, zero-returning, leveling, paralleling the upper and lower beams, checking axis movement, and making final checks.
| Power requirement | 200/220 V, AC, 3 phases, 50/60 Hz |
|---|---|
| Power cable | Four conductors, including grounding conductor |
| Recommended hydraulic oil | NCA250 (AMADA OIL) |
| Minimum distance from welder | At least 10 m {33 ft} |
| Ceiling clearance | At least 1000 mm {40 in.} above the machine |
| Rear work space | 1000 mm {40 in.} or more |
It requires 200/220 V, AC, 3 phases, 50/60 Hz.
The guide recommends NCA250 (AMADA OIL).
Keep it at least 10 m {33 ft} away from a welder or other equipment that may produce electric noise and magnetic fields.
The ceiling must be at least 1000 mm {40 in.} from the top of the machine.