Gentek ALIGN Exterior Cladding Installation Guide

This guide provides instructions for installing Gentek Align exterior cladding.


Gentek ALIGN Exterior Cladding Installation Guide - cover page
Brand
Gentek
Category
Other
Document type
Installation Guide
Language
English
Pages
16
File format
PDF
File size
4.7 MB
Published
26 October, 2023
Updated
26 October, 2023
MD5 checksum
069AFA47E6B443B57832D37C7FEB937B

About this manual

This guide provides instructions for installing Gentek ALIGN composite cladding, which is designed for horizontal applications only. It emphasizes the importance of complying with local building codes and using a proper weather-resistive barrier system. The document details requirements for substrate preparation, including the use of sheathing or furring strips to ensure a smooth, level surface.

What's inside

  • General Information
  • Safety
  • Transporting and Storing
  • Wall Preparation
  • New Construction
  • Remodel
  • Furring Applications
  • Fastener Requirements
  • Starter Strip Installation
  • Corner Posts

Specifications

Application TypeHorizontal applications only
Minimum Pocket Depth3/4"
Minimum Fastener Penetration1-1/4"
Nail Size7/16" head x 1/8" shank diameter
Screw SizeSize #8, truss or pan head
Staple GaugeMinimum 16 gauge

Frequently asked questions

Can ALIGN be installed directly over studs?

No, ALIGN must be installed over a sheathing that provides a smooth, flat surface and cannot be installed directly over studs.

What is the minimum temperature for installation?

ALIGN should not be installed in temperatures below -5°F (-20°C).

What tools are recommended for vertical cuts?

A circular saw with a fine tooth (plywood) blade installed backward or tin snips are recommended.

How should corner posts be fastened?

Do not fasten tightly; the corner post should be able to move to allow for expansion.

Download PDF (4.7 MB)