This document is a Conbextra Epoxy Grouts installation guide, which introduces the installation method of Conbextra Epoxy Grouts
This document serves as a guide for the typical grouting of machine bases using Fosroc Conbextra Epoxy Grouts. It emphasizes the importance of consulting with all parties involved if any doubts exist regarding the product or process. The guide details the preparation of the concrete foundation, specifically the removal of the laitance layer to ensure proper bond strength, and outlines various leveling methods for the machine baseplate, recommending leveling screws as the best method.
| Minimum curing time for concrete foundation | 28 days (4 weeks) |
|---|---|
| Ideal storage temperature range | Above 10°C and below 30°C |
| Ideal mixing temperature | 23°C |
| Recommended mixer power | 1600W |
| Recommended mixer paddle size | 120/140mm |
| Mixing speed | 350 to 400 RPM |
| Mixing duration | 2 to 3 minutes |
No, pre-soaking only applies to cement-based grouts; do not pre-soak when using resin-based grouts like Conbextra.
The best method is using Levelling Screws (Bolts) where the grout supports the weight of the machine after curing.
No, vibrators should never be used as the correct consistency epoxy grout minimizes the need for other flow assistance.