This is a document about 4591 model fountain installation instructions.
This guide provides step-by-step instructions for installing the LK 4591 Floor Mount Stone Fountain. It covers plumbing connections using 3/8" unplated copper tubing, electrical grounding precautions, mounting requirements, and stream height adjustment. The document also includes a parts list and troubleshooting tips for mineral deposits and flow regulation.
Important safety and compliance notes are included, such as checking local plumbing and electrical codes, using plastic drain fittings to avoid electrolysis, and ensuring the mounting structure can support a 300 lb load.
| Water Supply Tube | 3/8" O.D. unplated copper tube |
|---|---|
| Waste Pipe | 1-1/4" IPS |
| Operating Pressure Range | 20 psig to 105 psig |
| Stream Height Adjustment | Factory set at 45-50 PSI |
Use 3/8" O.D. unplated copper tubing for water supply.
The fountain operates between 20 psig and 105 psig.
Remove items 7 and 8, then adjust the screw on item 17; clockwise raises the stream, counter-clockwise lowers it.
Remove deposits with a small round file or small diameter wire, but do not file or cut the orifice material.