BlueSky Mast AL1/AL2 Standard Series User Manual

This document is the BlueSkyMast AL1 / AL2 Standard Series User Manual, which contains information on how to use, pay attention to, and install the product


BlueSky Mast AL1/AL2 Standard Series User Manual - cover page
Brand
BlueSky Mast
Category
Other
Document type
User Manual
Language
English
Pages
58
File format
PDF
File size
10.8 MB
Published
21 October, 2023
Updated
21 October, 2023
Model
AL1
MD5 checksum
5786316B8A6C493FC2A791279BAB7E59

About this manual

This user manual provides instructions for deploying the BlueSky Mast AL1 and AL2 Standard Series masts, which are designed for heights between 2 and 15 meters. It includes critical safety information regarding power lines, lightning, and wind conditions, as well as detailed guidelines for primary and secondary guying systems.

What's inside

  • Important Safety Precautions
  • Power Lines, Lightning and Grounding
  • Guy Ropes and Fasteners
  • Wind Conditions
  • Deployable Load
  • Wind Effects & Guying
  • AL1 Load Tables
  • AL2 Load Tables
  • Step by Step Deployment Instructions
  • Surface Wire Grounding Kit

Specifications

Mast Height Range2 - 15 Meters
Warranty DurationTwelve (12) Month
Maximum Safe Wind Speed for Deployment15 mph

Frequently asked questions

What is the recommended maximum wind speed for deploying the mast?

BlueSky Mast recommends not attempting to actively deploy the mast in winds that exceed 15 mph.

How far should the mast be kept from power lines?

The mast should be kept a distance equal to or greater than twice its height away from power lines.

Download PDF (10.8 MB)

More BlueSky Mast Manuals


View all BlueSky Mast manuals →