Chongqing Electric Machine Federation Vertical Mixed Flow Turbine Installation Guide

Instruction manual of vertical mixed flow turbine, introduces the installation, adjustment process and basic requirements of the turbine


Chongqing Electric Machine Federation Vertical Mixed Flow Turbine Installation Guide - cover page
Brand
Chongqing Electric Machine Federation
Document type
Installation Guide
Language
Chinese
Pages
43
File format
PDF
File size
483 KB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
AD8716FA575C686834B6C5AB38902DC1

About this manual

This document provides technical guidance for installing, commissioning, and testing vertical mixed-flow and axial-flow turbines designed and manufactured by Chongqing Electric Machine Federation. It covers procedures for buried components, guide mechanisms, rotating parts, piping, floors, and testing phases including no-load, speed, and load tests. Installation must follow design drawings and specifications, with records submitted for approval at each stage.

The guide also details equipment acceptance, storage requirements, and handling precautions for components, including humidity, temperature, and corrosion protection measures. It specifies storage categories, handling of precision parts, and maintenance intervals for components such as shafts, bearings, and electrical equipment. This manual is written in Chinese.

What's inside

  • General Installation Rules
  • Buried Component Installation
  • Guide Mechanism Installation
  • Rotating Part Installation
  • Piping and Instrumentation Installation
  • Floor and Hoist Installation
  • Commissioning and Testing Procedures

Frequently asked questions

What is the product described in this manual?

It is a vertical mixed-flow turbine.

Who is the manufacturer of this turbine?

Chongqing Electric Machine Federation LTD.PRC.

What standard should be followed if this manual conflicts with other documents?

GB/T8564 《水轮发电机组安装技术规范》 should be referenced.

Download PDF (483 KB)