This document is a maintenance manual for the TriScroll 300 series dry scroll vacuum pump, which mainly introduces the process of replacing tip seals
This document is a draft Tip Seal Replacement Manual for the Vacuum Technologies TriScroll 300 Series Dry Scroll Vacuum Pump. It details the procedures for disassembling the pump to access the tip seals, cleaning the scrolls, and reassembling the unit. The manual also lists related maintenance kits and factory service options available from Vacuum Technologies.
| Weight | 26.4 kg (58 lbs) |
|---|---|
| Cool-down time | one to two hours |
| Run-in time | 24 hours |
Tip seal replacement is generally recommended when the pump base pressure has risen to an unacceptably high level for your application.
Vacuum Technologies recommends applying a small amount of Krytox GPL 224 grease and wiping the O-rings shiny dry.
Yes, but 24 hours of run time is required before a base pressure of 10 mTorr can be achieved.