Viking Corporation Wet Pipe Sprinkler System Operation, Maintenance, and Troubleshooting Manual

provides a technical manual for the maintenance and repair of wet pipe sprinkler systems


Viking Corporation Wet Pipe Sprinkler System Operation, Maintenance, and Troubleshooting Manual - cover page
Brand
Viking Corporation
Document type
Service Manual
Language
English
Pages
38
File format
PDF
File size
1.5 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
F742FBF4EF31B027C86A8AB15E96BB59

About this manual

This manual provides detailed instructions for the operation, maintenance, and troubleshooting of Viking wet pipe sprinkler systems. It covers system components such as check valves, relief valves, and pressure gauges, along with installation requirements and testing procedures. The manual also includes troubleshooting sections for common issues like false alarms and pressure drops.

The system is designed for use in structures reliably maintained above 40°F (4°C) and complies with NFPA 13, FM Global, and other recognized standards. It includes diagrams and specifications for components like the Model J-1 Alarm Check Valve and Model C-1 Retard Chamber, with guidance on proper installation and maintenance intervals.

What's inside

  • SYSTEM DESCRIPTION
  • SYSTEM APPLICATIONS
  • SYSTEM REQUIREMENTS
  • SYSTEM COMPONENTS
  • WET SYSTEM NORMAL CONDITIONS
  • WET SYSTEM OPERATION
  • WET SYSTEM INSPECTIONS, TESTS, AND MAINTENANCE
  • REMOVING THE SYSTEM FROM SERVICE
  • USE OF DRY SPRINKLERS IN WET SYSTEMS
  • TROUBLESHOOTING VIKING WET SYSTEMS

Specifications

Relief Valve Size1/4” (6 mm)
Relief Valve Pressure Setting175 PSI (12.1 bar) or 10 PSI (0.7 bar) above maximum system pressure
Gauge Accuracywithin 3 percent of full scale
Gauge Replacement Intervalevery 5 years

Frequently asked questions

What is the maximum area a wet pipe system can cover on one floor?

Up to 52,000 square feet for light and ordinary hazard; 40,000 for extra hazard - hydraulically calculated; 25,000 for extra hazard - pipe schedule.

How often should pressure gauges be replaced or tested?

Every 5 years, or tested every 5 years by comparison with a calibrated gauge.

Download PDF (1.5 MB)