EDCO STEEL-KORE Steel Siding Installation Guide

This document is a guide for installing steel siding.


EDCO STEEL-KORE Steel Siding Installation Guide - cover page
Brand
Edco
Category
Other
Document type
Installation Guide
Language
English
Pages
12
File format
PDF
File size
1.5 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
BAA4C129D474BF766E6225F296484588

About this manual

This guide provides instructions for installing EDCO STEEL-KORE steel siding products. It emphasizes the importance of surface preparation, including checking for low spots, loose boards, and removing obstructions like downspouts or shutters before starting. The document lists necessary tools and equipment, such as power saws with specific blades, guillotine cutters, and protective wear.

What's inside

  • Tools & Equipment List
  • Surface Preparation
  • Starter Strip and Corners
  • Cutting Panels
  • Trimming Windows and Doors
  • J-Channel Installation
  • Drip Cap Installation

Frequently asked questions

What is the minimum length required for a level used during installation?

The manual requires a level with a minimum length of 24 inches.

How far apart should galvanized nails be spaced when fastening the starter strip?

You should space the galvanized nails every 12 inches on center.

Download PDF (1.5 MB)