This document is a guide for installing steel siding.
This guide provides instructions for installing EDCO STEEL-KORE steel siding products. It emphasizes the importance of surface preparation, including checking for low spots, loose boards, and removing obstructions like downspouts or shutters before starting. The document lists necessary tools and equipment, such as power saws with specific blades, guillotine cutters, and protective wear.
The manual requires a level with a minimum length of 24 inches.
You should space the galvanized nails every 12 inches on center.