This manual provides instructions on the assembly, installation, operation and maintenance of the TT Electric Thruster 110-140TT 2.0.
This manual provides instructions for the installation, operation, and servicing of the Lewmar 110-140TT 2.0 electric thruster. It emphasizes safety requirements, such as ensuring the thruster is installed by a qualified engineer and operated away from swimmers due to water suction risks. The document details the necessary tunnel dimensions and electrical specifications for proper setup.
| Tunnel Inside Diameter (110 model) | 110 mm |
|---|---|
| Tunnel Inside Diameter (140 model) | 140 mm |
| Hub/saddle bolt torque (110 model) | 5 Nm |
| Hub/saddle bolt torque (140 model) | 9 Nm |
| Propeller nut torque (110 model) | 6 Nm |
| Propeller nut torque (140 model) | 10 Nm |
| Motor assembly bolt torque | 20 Nm |
The thruster should only be installed by a specialist or a qualified marine engineer.
No, the thruster should not be operated close to swimmers due to the powerful suction of water generated.
The minimum suggested tunnel length is 2 times the tunnel diameter (2 x Ø).
No, an automatic battery switch cannot be used with this product.