This manual provides instructions for the operation, maintenance, and installation of Z-Series Sliding Vane Pumps truck and stationary pumps. This manual is intended to help users operate and maintain Z-Series Sliding Vane Pumps correctly.
This document serves as the official Installation, Operation & Maintenance Manual for Corken Z-Series Sliding Vane Pumps, specifically covering truck models (Z3200, Z2000, Z4200) and stationary models (Z4500, Z3500). It provides essential safety warnings regarding the transfer of hazardous substances and mandates that all work be performed by qualified personnel in compliance with applicable laws and safety standards.
| Sound Level | 85 dBA at 1 meter |
|---|---|
| Warranty Period | One year from installation |
Inspection, maintenance and installation must be made only by experienced, trained and qualified personnel.
Corken warrants its products for one year from the date of installation, provided it does not extend beyond 24 months from shipment.
Maintenance, use and installation must comply with Corken instructions and NFPA Pamphlet 58 for LP-Gas.