EL-PRESS Quick Installation Guide, introducing the features and characteristics of the product, including functional characteristics and usage instructions
This guide walks you through installing Bronkhorst EL-PRESS instruments in 9 steps: checking functional properties, pressure and piping, mounting, leak checks, electrical connections, analog/digital operation, switch functions, and purging. It covers pressure ranges 0…100 mbar and 0…400 bar, with RS232 and fieldbus options. Always ensure clean piping, correct power (15–24 Vdc), and avoid dual power sources to prevent damage.
EL-PRESS instruments are powered with +15…24 Vdc.
Never power the instrument simultaneously from two different power sources (e.g. fieldbus connection and Plug-in Power Supply). Doing so will damage the printed circuit board irreparably.
For best performance of a pressure controller, let the instrument warm up for at least 30 minutes before starting measurement and control (this can be done while purging). For a pressure meter, the warm-up time is negligible.