Affinity Stone Installation Guide

Affinity Stone Installation Guide


Affinity Stone Installation Guide - cover page
Brand
Affinity Stone
Category
Other
Document type
Installation Guide
Language
English
Pages
9
File format
PDF
File size
9.8 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
DC790710D56167C38815AD698FFC2D46

About this manual

This installation guide details the process for installing Affinity Stone panels, emphasizing a mortar-free and hassle-free approach. The product features an easy-fit interlocking system designed for a smooth and secure fit, suitable for various building projects. The guide outlines the necessary components, including starter strips, wainscot caps, and corner panels, as well as the tools required for the job.

The document provides specific instructions for preparing the wall, whether it is a standard framed wall or a concrete wall, and details the step-by-step installation process. Key steps include marking the starter strip, installing the first course with proper alignment, and offsetting subsequent courses for a natural appearance. Special attention is given to the last course and outside corners to ensure a professional finish.

What's inside

  • Introduction
  • Affinity Stone Components
  • Tools Required
  • Jobsite preparation
  • Installing the Starter Strip
  • Installing Affinity Stone Panels
  • The Last Course
  • Outside Corners

Frequently asked questions

What tools are required to install Affinity Stone panels?

You will need a level, chalk line, screw gun, masonry saw, dead blow hammer, straight edge, hammer, and safety equipment.

What is the minimum screw requirement for installing Affinity Stone panels?

You must use a minimum of 2 screws per panel, with 1 screw required to be into the framing member.

How far above the desired height should the starter strip be marked?

Mark a horizontal and level line 4 ¼ inches above the desired height of the bottom of the stone.

Download PDF (9.8 MB)