ROHDE TG 80 Gas Top Loading Kiln Instruction Manual

This is an instruction manual for a gas top loading kiln, which mainly introduces the precautions for transportation, installation and use of the kiln


ROHDE TG 80 Gas Top Loading Kiln Instruction Manual - cover page
Brand
Rohde
Category
Other
Document type
User Manual
Language
English
Pages
18
File format
PDF
File size
129 KB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
7B4D3C0084C3779C70AAAC942AB63B56

About this manual

This instruction manual covers the ROHDE TG 80 gas top-loading kiln, a high-quality product suitable for firing up to 1320°C. It includes detailed steps for initial operation, such as unpacking, assembling chimney panels, installing the thermocouple, and igniting the burner unit. The document also outlines general operating instructions for correct firing and provides guidelines for maintenance and cleaning.

What's inside

  • Preface
  • Product family
  • Important safety instructions
  • Initial Operation
  • Assembly of Kiln
  • Install chimney panels
  • Install thermocouple
  • Connect burner unit
  • General instructions for operation
  • Maintenance / cleaning

Specifications

Maximum firing temperature1320°C
Product typeGas Top-loading Kiln
Included equipment (TG 80)1 burner unit

Frequently asked questions

What is the maximum firing temperature of the kiln?

The kiln is suitable for firing up to 1320°C.

How long is the guarantee period?

The manufacturer grants a 36-month guarantee from the date of invoice.

Who should perform maintenance on the burner unit?

Repair and maintenance of the burner unit must be carried out by a specialist authorized by the manufacturer.

Download PDF (129 KB)

More Rohde Manuals


View all Rohde manuals →