Dettson AMP105-IE2 AMP120-IE2 Installation Instructions

Installation Instructions


Dettson AMP105-IE2 AMP120-IE2 Installation Instructions - cover page
Brand
Dettson Industries Inc
Category
Other
Document type
Installation Guide
Language
English
Pages
27
File format
PDF
File size
1.5 MB
Published
20 October, 2023
Updated
20 October, 2023
MD5 checksum
4CB008CA84B8F07C7049EFAAA552F96B

About this manual

This document provides installation instructions for the Dettson AMP105-IE2 and AMP120-IE2 oil furnaces. It includes safety regulations, installation requirements, wiring diagrams, and maintenance procedures. The furnace can be configured in upflow, counterflow, or horizontal airflow modes with minimal modifications. It requires 115VAC power, oil line connections, ductwork, and proper venting. Safety warnings cover fuel type, combustion chamber conditions, and environmental disposal.

What's inside

  • Safety Regulations
  • Installation Requirements
  • Wiring Diagrams
  • Blower Speed Adjustments
  • Blocked Vent Shut-Off Cleaning
  • Parts Lists
  • Technical Specifications

Specifications

Fuel TypeGrade 2 fuel oil maximum
Voltage Requirement115VAC
Airflow CapacityRefer to Table 6 for expected airflow at various external static pressures

Frequently asked questions

What fuel type is recommended for these furnaces?

Grade 2 fuel oil maximum. Do NOT use gasoline, crankcase oil or any oil containing gasoline.

What voltage is required for the control panel?

115VAC line voltage connection.

Can this furnace be configured for different airflow directions?

Yes, it can operate in upflow, counterflow (downflow), and horizontal (left-to-right or right-to-left) airflow modes.

Download PDF (1.5 MB)