This document is the installation instructions of Perma MRI AIR Shelter
This document provides installation instructions for the Perma Tech MRI AIR Shelter with Track & Trolley. It includes critical safety warnings, shipping inspection notes, and a step-by-step guide for assembling the shelter frame, attaching the airbag components, and connecting the blower system. The guide specifies the use of anchor bolts and roofing nails, noting that certain hardware like wall-mounting brackets are not included.
You should use about one nail every 12 inches when attaching the hem to the head frame and when attaching the side members to the side frame.
The first strap must be one foot off the ground, and the second strap must be five to six feet from the ground.
The airbag blower duct sleeve comes in a 36" length.
Perma Tech warrants the material and workmanship for a period of one year from the date of shipment to the customer.