Perma Tech MRI AIR Shelter with Track & Trolley Installation Instructions

This document is the installation instructions of Perma MRI AIR Shelter


Perma Tech MRI AIR Shelter with Track & Trolley Installation Instructions - cover page
Brand
Perma Tech
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
4
File format
PDF
File size
994 KB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
400228E7EB0853C8E8E8DDC5841B973C

About this manual

This document provides installation instructions for the Perma Tech MRI AIR Shelter with Track & Trolley. It includes critical safety warnings, shipping inspection notes, and a step-by-step guide for assembling the shelter frame, attaching the airbag components, and connecting the blower system. The guide specifies the use of anchor bolts and roofing nails, noting that certain hardware like wall-mounting brackets are not included.

What's inside

  • Installation Instructions
  • Shipping Containers
  • Marking Centerlines
  • Mounting Head Frame
  • Attaching Side Frames
  • Unfolding Unit
  • Attaching Roofing Nails
  • Side Member Tie-back Straps
  • Blower Duct Sleeve
  • Track and Trolley Brackets

Frequently asked questions

How often should roofing nails be spaced when attaching the hem and side members?

You should use about one nail every 12 inches when attaching the hem to the head frame and when attaching the side members to the side frame.

What are the required heights for the side member tie-back straps?

The first strap must be one foot off the ground, and the second strap must be five to six feet from the ground.

What is the length of the airbag blower duct sleeve?

The airbag blower duct sleeve comes in a 36" length.

What is the warranty period for Perma Tech products?

Perma Tech warrants the material and workmanship for a period of one year from the date of shipment to the customer.

Download PDF (994 KB)

More Perma Tech Manuals


View all Perma Tech manuals →