This document describes the drive chain renewal procedure for the Nu-Star Power Pusher 15-45/10-45 series machines.
This service manual details the procedure for renewing the drive chain on Nu-Star Power Pusher 15-45/10-45 machines. It includes safety precautions, disassembly steps, chain removal and installation, and reassembly instructions. The guide emphasizes safety, proper tool use, and correct battery handling to avoid damage or injury.
The process involves raising the machine, disconnecting power and batteries, removing the battery tray, loosening motor bolts, sliding the motor assembly forward to release chain tension, removing the old chain, installing the new chain with a master link, re-tensioning the motor assembly, and reassembling components with grease applied to the chains.
Always observe warning signs, wear appropriate PPE, ensure the machine is OFF and isolated via the emergency stop, and disconnect all power and battery leads before beginning.
Ideally, HP Lithium Grease should be used in this application.