Chart ADF105™ Automatic Dewar Filling Station Operation Manual

ADF105 Automatic Dewar Filling Station operation manual, introduces the features and characteristics of the product, such as highlights, key benefits, safety precautions, receiving and installation, operation, troubleshooting, specifications, etc.


Chart ADF105™ Automatic Dewar Filling Station Operation Manual - cover page
Brand
CHART
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
18
File format
PDF
File size
393 KB
Published
19 October, 2023
Updated
19 October, 2023
MD5 checksum
74F5186FCC523E7247EB50D62B0D1B2C

About this manual

This manual provides instructions for operating the Chart ADF105™ Automatic Dewar Filling Station, designed to safely and automatically fill liquid nitrogen dewars. It includes safety guidelines, installation steps, operational features like max fill timer and vent interlock, and troubleshooting. The station is suitable for indoor or covered outdoor use and uses cryogenic sensors to detect fullness, shutting off the fill cycle to prevent overfilling. It comes with a two-year warranty and is not intended for oxygen use.

What's inside

  • Revision Log
  • Preface
  • General
  • Highlights
  • Key Benefits
  • Terms
  • Acronyms / Abbreviations
  • Safety
  • Receiving and Installation
  • ADF105 Station Controller

Specifications

Max Fill Pressure125 psi
Inlet Pressure125 psi (8.6 bar)
WarrantyTwo years

Frequently asked questions

What is the maximum fill pressure for the ADF105 station?

The maximum fill pressure is 125 psi (8.6 bar).

Is the ADF105 station suitable for oxygen use?

No, the station is not intended for oxygen use.

Download PDF (393 KB)

More CHART Manuals


View all CHART manuals →