This is a sewing machine instruction manual, including installation, lubrication, operation and adjustment.
This service manual provides detailed instructions for installing, adjusting, lubricating, and maintaining the Juki MF-7500 high-speed, flat-bed coverstitch machine. It includes specifications, component configuration, step-by-step installation procedures, lubrication guidelines, and maintenance tasks such as cleaning, oil replacement, and oil filter inspection. Safety warnings are included for each operation to prevent injury.
| Model | MF-7500 series |
|---|---|
| Stitch Type | ISO standard 406, 407, 602, and 605 |
| Sewing Speed | Max. 6,500 sti/min (at the time of intermittent operation) V-belt type 6,000 sti/min (at the time of intermittent operation) Direct-drive type Factory-set sewing speed at the time of shipment. 4,500 sti/min (at the time of intermittent operation) |
| Needle Gauge | 3-needle ... 4.8 mm, 5.6 mm, and 6.4 mm 2-needle ... 3.2 mm and 4.0mm |
| Differential Feed Ratio | 1:0.7 to 1:2 (stitch length : less than 2.5 mm) Micro-differential feed adjustment mechanism is provided. |
| Stitch Length | 1.2 mm to 3.6 mm (can be adjusted up to 4.4 mm) |
| Needle | UY128GAS #98 to #12S (standard #108) |
| Needle Bar Stroke | 31mm (or 33 mm when changing over the eccentric pin) |
| Dimensions | (Height) 451 x (Width) 515 x (Length) 263 |
| Weight | 46kg |
| Lift of Presser Foot | 8 mm (needle gauge : 5.6 mm without top covering), and 5 mm (with top covering) Micro-lifter mechanism is provided. |
| Lubricating Oil | JUKI GENUINE OIL 18 |
| Oil Reservoir Capacity | Oil gauge lower line : 600 cc to upper line : 900 cc |
| Noise Level | 76.5 dB (A-weighted); (Includes Kpa = 2.5 dB); according to ISO 10821- C.6.2 -ISO 11204 GR2 at 4,500 sti/min. |
Max. 6,500 sti/min (at the time of intermittent operation) for V-belt type, 6,000 sti/min for direct-drive type, and 4,500 sti/min at factory-set speed.
3-needle: 4.8 mm, 5.6 mm, and 6.4 mm; 2-needle: 3.2 mm and 4.0 mm.
JUKI GENUINE OIL 18.
Replace the lubricating oil after approximately one month for new machines, then every six months.