This is an installation manual, which mainly introduces the installation method of CNH 7,8,9 series combine harvesters 5000 series track modules
This manual provides instructions for installing track modules on CNH 7, 8, and 9 Series combine harvesters. It includes definitions of abbreviations, a list of recommended tools and material handling equipment, and a detailed parts list with part numbers and descriptions.
| Oscillation Plate Bridge Bolt Torque | 400 ft-lbs |
|---|---|
| Track Module Mounting Bolt Torque (Initial) | 250 ft. lbs |
| Track Module Mounting Bolt Torque (Final) | 400 ft. lbs (542 Nm) |
| Bolt Specification (Mounting) | M20-2.5 x 120 GR 10.9 |
| Break-in Run Time | 10 hours |
Required tools include 34 mm, 30 mm, and 19 mm sockets, combination wrenches, ratchets, a 600 lb. torque wrench, and a ½” to ¾” drive adapter.
The machined mounting surface of the Drive Wheel is on the inside of the Track Module and oriented towards the combine.
Apply talc to the drive lugs, run the vehicle for ten hours, and check hydraulic pressure and bolt torque until stabilized.