Tennessee Department of Transportation Geotechnical Guidelines

This publication provides guidance on general policies and procedures that are to be followed by geotechnical engineers in the planning, design, construction, and maintenance of the Tennessee Department of Transportation's (TDOT) roadway and structural systems.


Tennessee Department of Transportation Geotechnical Guidelines - cover page
Brand
Tennessee Department of Transportation
Category
Other
Document type
Other
Language
English
Pages
86
File format
PDF
File size
2.5 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
B70E11CEBD2B734D2C821C38D1AE9DDB

About this manual

This document establishes uniform procedures for geotechnical services provided by the Tennessee Department of Transportation (TDOT) and its Geotechnical Engineering Section (GES). It outlines the scope of work, organizational structure, and the relationship between these guidelines and other recognized TDOT reference documents like the Design Guidelines and Standard Specifications.

The guidelines cover various aspects of geotechnical work, including roadway design deliveries, structural foundation reports, and operations maintenance support. They provide specific instructions on project numbering systems (PIN, GES File Number, PE numbers) to ensure consistent tracking and communication across TDOT projects.

What's inside

  • Foreword
  • Recognized TDOT Reference Documents
  • Organizational Structure
  • TDOT Project Numbers Defined
  • Correspondence with TDOT GES
  • Roadway Design Deliveries
  • Structural Foundation Deliveries
  • Operations Maintenance Support
  • Soils and Geology Report Standard Format
  • Appendices

Frequently asked questions

What is the purpose of the PIN number in TDOT project documentation?

The PIN number is the unique identifier assigned to a project that must be used in all subsequent documents, including the subject lines of emails, letters, and memoranda.

When does the Tennessee fiscal year begin and end?

The fiscal year begins on July 1 and ends on June 30.

What code is used for geotechnical work performed on new projects before ROW plans are issued?

Geotechnical work performed for new projects is charged to the PE-N with Code 0 until ROW plans are issued.