Dean 1824G & 2424G Flatbottom Gas Fryers Installation & Operation Manual

This document provides instruction for the operation of NON-CE & 24G Series Flatbottom Gas Fryers


Dean 1824G & 2424G Flatbottom Gas Fryers Installation & Operation Manual - cover page
Brand
Dean
Category
Commercial trade
Document type
User Manual
Language
English
Pages
46
File format
PDF
File size
666 KB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
7DDAEAEE2FF54513CC5720CA606851CA

About this manual

This manual provides instructions for the installation and operation of the Dean 24G Series Flatbottom Gas Fryers, specifically models 1824G and 2424G. It covers safety precautions, receiving and unpacking the equipment, and general principles of operation. The document emphasizes that installation, maintenance, and repairs must be performed by qualified personnel to maintain the warranty and ensure safety.

What's inside

  • Introduction
  • Safety Information
  • Receiving and Unpacking
  • Installation Instructions
  • Gas Connections
  • Controller Operation
  • Preventative Maintenance
  • Troubleshooting

Frequently asked questions

What type of personnel must operate and service this appliance?

This appliance is intended for professional use only and must be operated and serviced by qualified personnel.

What specific actions must be taken if shipping damage is discovered after unpacking?

You must notify the freight company or carrier immediately and file a concealed damage claim within 15 days of the delivery date.

What must be done to the fryer before its initial operation?

You must remove all plastic skin from the sides, front, and doors of the fryer before starting it.

Download PDF (666 KB)