This is a manual for RPS product installation
This guide provides step-by-step instructions for installing RPS pipe and fittings, including handling, storage, safety precautions, and joining methods. It emphasizes the purchaser’s responsibility for proper installation and system design. Safety is critical, especially when handling resins, adhesives, and catalysts, which are flammable and toxic. The guide also covers material shelf life, storage conditions, and bonding procedures for tapered and butt joints.
The document includes detailed sections on unloading, transporting, and storing FRP products, with specific warnings against point loading, using chains, or storing catalysts near open flames. It also outlines safety equipment requirements and ventilation guidelines for safe handling of chemicals.
Never use open flame, sparks, or hot surfaces. Use CO2, dry chemical, or foam to fight fires. Avoid skin and eye contact and breathing vapors. Store catalysts and resins in cool, dry areas (5°C to 25°C).
Polyester Resins & Paste: 6 months max. BPO Catalyst: 12 months max. Epoxy Resins & Paste: 12 months max. E1500 Adhesive: 12 months max. ‘A’ Liner Repair Paste: 12 months max.
Store on level supports or sand. Avoid point loading. Cover supports with carpet or masonite if necessary. Do not store on snow if point loading may occur when snow melts.