Orenco Systems VCOM-S1 RO Control Panel Installation Manual

This document is about the installation manual of VeriComm Control Panel VCOM-S1 RO, providing specific installation steps and precautions.


Orenco Systems VCOM-S1 RO Control Panel Installation Manual - cover page
Brand
Orenco Systems
Category
Industrial Robot
Document type
Installation Guide
Language
English
Pages
10
File format
PDF
File size
1.1 MB
Published
18 October, 2023
Updated
18 October, 2023
MD5 checksum
DB13407A2E908EC19A5D44054FB1AD68

About this manual

This document provides step-by-step instructions for installing the VCOM-S1 RO control panel, including mounting, wiring floats and pumps, and connecting power and phone lines. It emphasizes safety, proper grounding, and compliance with electrical codes. The panel works with the VeriComm Monitoring System and includes diagrams for wiring and float arrangements.

Key installation steps include securing the panel to a post or wall, installing splice boxes for floats and pumps, wiring according to terminal diagrams, and connecting a standard analog phone line. The manual also includes wire size recommendations, torque specifications, and warnings about hazardous areas and code compliance.

What's inside

  • Control Panel Installation
  • Float and Pump Installation
  • Control Panel Connections
  • Telephone Line Installation
  • Wiring Diagrams
  • Safety and Code Compliance

Specifications

ModelVCOM-S1 RO
Recommended Breaker & Wire Size120 VAC 1/2 hp: 20 amp 10 AWG; 240 VAC 1/2 hp: 15 amp 14 AWG

Frequently asked questions

What is the recommended wire size for pump motors?

Wire size depends on voltage and motor size; for example, 120 VAC 1/2 hp requires 10 AWG, while 240 VAC 1/2 hp requires 14 AWG.

What is the voltage for the control panel?

The controls in the panel are always 120 VAC, while pump voltage may be 120 VAC or 240 VAC.

Download PDF (1.1 MB)