This document contains instructions for installing the Nocturne™ Exterior Projection Screen
This document provides step-by-step installation instructions for the Draper Nocturne Exterior Projection Screen. It covers preparation, mounting the screen case to the wall or ceiling, and installing side cable guides if required. The guide includes specific procedures for both crank-operated and motorized units.
| Operating Voltage | 110-120V, 60 Hz |
|---|---|
| Cable Lead Length | 6' |
| Minimum Clearance for Closure | 1¾" |
| Maximum Blocking Depth | 3" |
No, you must not wire motors in parallel without written permission from Draper.
Yes, minor tweaks are possible, but adjustments may negatively affect screen flatness and void the warranty.
No, the wall switches provided with these screens are interior switches and should not be installed outdoors.