This is a document about the Damage Prevention Procedure Manual
The Damage Prevention Procedure Manual (DPPM) is part of an integrated set of operating policy and procedure manuals maintained by Buckeye Partners, LP. These documents are designed to complement each other to provide personnel with the necessary policies, procedures, and requirements to safely operate, maintain, and repair the company's pipeline systems and facilities while complying with 49 CFR Parts 192 and 195.
The manual covers a wide range of administrative and operational topics, including encroachment definition and prevention, right of way patrols, encroachment abatement, one call procedures, line locating and marking, excavation preparation and execution, sloping and shoring, supports, underground structure clearance, rock removal, backfilling, blasting, pipeline protection at crossings, incident management, terminal protection, maximum cover requirements, and second party contractor excavation.
The manual contains policies and procedures that address state and federal Damage Prevention regulations.
These manuals shall be reviewed once each calendar year, not to exceed 15 months.
The Codes, Standards, and Publications Lead shall verify that all Manuals have been reviewed.