Manual Rising Arm Barrier Installation, Commissioning, Operation and Maintenance Manual

This manual provides detailed information about manual rising arm barriers, including safety information, technical data, general safety standards, general description, operation, maintenance, etc.


Manual Rising Arm Barrier Installation, Commissioning, Operation and Maintenance Manual - cover page
Brand
MANUAL
Category
Industrial Robot
Document type
Service Manual
Language
English
Pages
30
File format
PDF
File size
1.8 MB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
FD8E4F7D2814F4DA2B95FD931431A531

About this manual

This manual provides detailed instructions for installing, commissioning, operating, and maintaining Manual Rising Arm Barriers. It covers safety standards, technical specifications, mechanical adjustments, and maintenance schedules. The barrier is designed for controlling vehicular access and includes safety warnings and precautions for proper use. Maintenance procedures include lubrication, spare parts ordering, and risk assessment guidance.

What's inside

  • Safety Information
  • Technical Data
  • General Safety Standards
  • General Description
  • Handling
  • Installation
  • Mechanical Adjustments
  • Commissioning
  • Operation
  • Maintenance

Specifications

ConstructionSteel Frame, Aluminium Arm

Frequently asked questions

What is the maximum weight capacity of the barrier arm?

The barrier arm can support a weight of up to 250 Kg.

How long does the concrete foundation need to cure before installation?

A minimum of 7 to 10 days is required for the concrete to cure, depending on the climate.

What is the minimum clearance required around the barrier pedestal?

Accessibility around the whole of the barrier pedestal should be maintained to a minimum of 1000mm.

Download PDF (1.8 MB)

More MANUAL Manuals


View all MANUAL manuals →