Maibec Regular Siding Installation Guide

This document is the installation guide of Maibec siding, which introduces the features of Maibec siding and the installation method


Maibec Regular Siding Installation Guide - cover page
Brand
Maibec
Category
Other
Document type
Installation Guide
Language
English
Pages
14
File format
PDF
File size
5.1 MB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
72821A9B3739C6777E8489C953F9D200

About this manual

This guide provides instructions for installing Maibec Regular Siding, emphasizing the importance of managing water infiltration and ensuring proper wall ventilation to prevent rot and mould. It details requirements for using specific Maibec hot dipped zinc galvanized ring shank nails and outlines correct nailing patterns for various profile types.

What's inside

  • Managing Water
  • Ventilating the Wall
  • Protecting the Integrity of the Siding
  • Storage
  • Before You Begin Installation
  • Installation System
  • Nail Lengths
  • Nail Placement

Specifications

Minimum clearance from ground8"
Minimum clearance from adjacent structures2"
Space between siding and flashing1/2"
Minimum opening for non-Maibec ventilated strips50%
Minimum nail penetration1"
Installation window after delivery10 weeks

Frequently asked questions

What type of nails should be used for Maibec siding?

Maibec siding is installed with Maibec hot dipped zinc galvanized ring shank nails with textured head, factory-stained to match the siding colour.

What is the minimum clearance required from the ground?

An 8-inch clearance is required from the ground to allow for continuous drainage of infiltrated water.

How long after delivery should the siding be installed?

The siding must be installed within 10 weeks of delivery to prevent the wood from drying out.

Download PDF (5.1 MB)