BYD Battery-Box Pro 13.8 Installation Guidance

This manual introduces the safety installation, product overview, installation, etc. of BYD Battery-Box Pro 13.8


BYD Battery-Box Pro 13.8 Installation Guidance - cover page
Brand
BYD
Category
Other Electronics
Document type
Installation Guide
Language
English
Pages
53
File format
PDF
File size
1.5 MB
Published
17 October, 2023
Updated
17 October, 2023
MD5 checksum
27AE527BD158F01395D9D345A7BD4DAA

About this manual

This document serves as the installation guidance for the BYD Battery-Box Pro 13.8, an energy storage unit designed for both off-grid and on-grid applications. It is intended for skilled personnel, specifically trained electricians or installers, who possess knowledge of electrical devices and relevant safety regulations. The guide emphasizes that the device must be installed in a location complying with IP20 regulations and warns against short circuits between positive and negative terminals.

What's inside

  • Introduction
  • Safety Guidelines
  • Product Overview
  • Terminal Introduction
  • Installation Notice
  • Package Information
  • Tools and PPE
  • Unpacking and Disassembly
  • Anchor Bolt Installation
  • Connecting Inverter

Frequently asked questions

What is the maximum number of Battery-Box Pro 13.8 units that can be connected in parallel?

The system supports parallel connection between Battery-Box Pro 13.8 with a maximum number of 32.

What is the maximum altitude at which the Battery-Box LV system can be installed?

The Battery-Box LV system can be installed at altitudes of up to 2000m above Mean Sea Level.

Who is the target group for this installation guide?

This guide applies only to skilled workers, defined as trained and qualified electricians or installers.

Download PDF (1.5 MB)

More BYD Manuals


View all BYD manuals →