Marvell Nanofabrication Laboratory Process 6.11 Crystal Monitor Replacement Manual

This document describes the cleaning procedures necessary to change a standard plug-in crystal monitor correctly.


Marvell Nanofabrication Laboratory Process 6.11 Crystal Monitor Replacement Manual - cover page
Brand
Marvell Nanofabrication Laboratory
Category
Industrial Supply
Document type
Service Manual
Language
English
Pages
2
File format
PDF
File size
81 KB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
E4D53BBC2F4919A6FE5C3877872C3575

About this manual

This document outlines the procedure for changing a standard plug-in crystal monitor, specifically for use with evaporators from manufacturers such as Cha, Ultex2, Tescal, and NRC. The process involves removing shields, extracting the old monitor assembly, cleaning the components, and installing a new crystal monitor with a spring clip.

What's inside

  • Process Summary
  • Material Controls & Compatibility
  • Definitions & Process Terminology
  • Safety
  • Process Explanation
  • Process Procedure

Specifications

Crystal Frequency6 MHz
Crystal Monitor CostUnder $10
Replacement Threshold100% life consumed

Frequently asked questions

When should a crystal monitor be changed?

The crystal must be changed when it reads more than 100% life consumed, though changes as early as 80% are appropriate for sensitive processes.

What is required for cleaning the monitor assembly?

The assembly must be cleaned until the stainless steel surfaces are shiny, using Scotch-Brite, IPA, or a razor blade depending on the level of cleanliness.

Download PDF (81 KB)