This manual is for assisting with the general installation of Thermo King® components onto trucks designed and built for refrigerated applications. The Thermo King Installation Standards and Procedures Guide (TK 56430) provides more detailed information that must be followed to safely and properly complete the entire installation.
This manual provides instructions for the general installation of Thermo King E-200 Series single temperature systems onto trucks designed for refrigerated applications. It covers essential safety precautions, required tools, and support materials needed before beginning the installation process.
The guide details the step-by-step procedures for unpacking, inspecting, and installing the condenser and evaporator units. It also includes specific instructions for wiring connections, battery connections, and setting up the in-cab controller, along with troubleshooting and adjustment procedures for pressure regulators.
| Additional Amperage Requirement | 115 amps |
|---|---|
| Lifting Capacity Requirement | 34 kilos (75 lbs) |
Yes, in the U.S., EPA 608 certification is required to work on refrigeration systems.
The Evacuation Station includes a Manifold Assembly, Micron Gauge, and Vacuum Pump.