Provides instructions on installation and operation of the Ironer IS Series
The document serves as a comprehensive guide for the installation and daily operation of the Ironer IS Series. It covers critical safety information, site requirements including electrical and gas connections, and detailed procedures for initial startup and normal use.
Additionally, the manual provides specific instructions for maintenance tasks such as troubleshooting control and belt problems, along with periodic maintenance schedules. A significant portion is dedicated to technical setup, detailing step-by-step procedures for setting up the pilot and main burners to ensure proper combustion performance.
Do not try to light any appliance or touch electrical switches. Clear the area of occupants and immediately call your gas supplier from a neighbor's phone.
Allow at least 5 minutes after power has been removed to allow the AC inverter drive to discharge.
The pilot should read 40-45mV DC when measured with the CHANNEL PRODUCTS FT-003 flame sense probe.