Dinex STS II Induction Charger Operation & Maintenance Manual

This manual introduces the main features, installation, operation, troubleshooting, maintenance and warranty of Smart•Therm™ STS II Induction Charger.


Dinex STS II Induction Charger Operation & Maintenance Manual - cover page
Brand
Dinex
Document type
User Manual
Language
English
Pages
8
File format
PDF
File size
663 KB
Published
16 October, 2023
Updated
16 October, 2023
MD5 checksum
8FE56D616E48CE33BB756DC47F4F1A9C

About this manual

The Dinex Smart•Therm™ STS II is an induction base heating system designed for use with Dinex Smart bases to keep hot plated food warm. The unit features a user interface with LCD display and arrow keys for controlling charging cycles, language settings (English, Spanish, French), and warning alerts.

What's inside

  • Introduction
  • Installation
  • Operating Instructions
  • Manager Options
  • Troubleshooting
  • Maintenance
  • Warranty

Frequently asked questions

How long can the system keep hot plated food warm?

When used with Dinex insulated domes, the system keeps hot plated food satisfying for up to one hour from plating.

How long does it take to fully charge a base?

The charge time for a base will be between 16 to 20 seconds.

What clearance is required around the charger for cooling?

You must maintain at least two inches of clearance on all sides of the charger.

Download PDF (663 KB)