The document is the Schluter®-DITRA-HEAT Installation Guide, which introduces how to install wood joist, uncoupling membrane and heating cables etc.
This guide provides installation instructions for the Schluter DITRA-HEAT uncoupling membrane system equipped with heating cables. It is designed for use over wood subfloors in interior dry or wet areas, ensuring compatibility with ceramic, porcelain, and natural stone tiles. The document outlines specific requirements for subfloor preparation, including joist spacing and minimum thicknesses for single or double-layer wood constructions.
Key installation steps include the proper placement of movement joints, which are required in addition to the membrane, and the selection of appropriate setting and grouting materials compliant with ANSI standards. The guide also details limitations regarding tile sizes and specific considerations for natural stone and moisture-sensitive materials.
| Maximum joist spacing (single layer) | 16" (406 mm) o.c. |
|---|---|
| Maximum joist spacing (double layer) | 24" (670 mm) o.c. |
| Minimum subfloor thickness (single layer) | 19/32" (76 mm) |
| Minimum subfloor thickness (double layer) | 23/32" (79 mm) |
| Minimum tile size (natural stone) | 2" x 2" (50 mm x 50 mm) |
| Required setting mortar | Unmodified thin-set mortar - ANSI A118.1 |
No, movement joints including perimeter joints must still be installed in accordance with industry standards.
The maximum spacing is 16 inches on center for a single layer subfloor, or 19.2 inches on center for a single layer subfloor with specific requirements.
The minimum subfloor thickness must be 19/32 inch or 5/8 inch nominal.
Seams and transitions must be sealed using unmodified thin-set mortar.