Pyro-Chem PCL-160/300/460/600 Kitchen Knight II Design, Installation, Recharge, and Maintenance Manual

This bulletin is a temporary supplement to the KITCHEN KNIGHT II Technical Manual (PN551274-4) dated March 1, 2006 and is not intended to replace the requirements and limitations outlined in the current manual.


Pyro-Chem PCL-160/300/460/600 Kitchen Knight II Design, Installation, Recharge, and Maintenance Manual - cover page
Brand
Pyro-Chem
Category
Other
Document type
Service Manual
Language
English
Pages
86
File format
PDF
File size
2.1 MB
Published
15 October, 2023
Updated
15 October, 2023
MD5 checksum
A6B02EAD991EB24E316D1D075F1DA0AB

About this manual

This manual provides instructions for the design, installation, recharge, and maintenance of Pyro-Chem Kitchen Knight II Restaurant Fire Suppression Systems. It is intended for use by individuals who have attended a Pyro-Chem training program and are authorized to install, recharge, design, and maintain these systems.

The document details specific procedures for system cleanup and recharge, including safety precautions for handling wet agents, flushing the piping network, and rebuilding valve components. It also outlines specific nozzle positioning and coverage limitations for the Nieco Broiler Model MPB 94.

What's inside

  • Foreword
  • Explanation of Safety Alerts
  • Revision Record
  • Nieco Broiler Protection
  • System Cleanup
  • System Recharge
  • Valve Rebuilding
  • Pressure Regulator Rebuilding

Specifications

Maximum Heat Input109,590 Btu/hr
Nozzle QuantityOne
Nozzle Type2L
Nozzle Height20 in. (508 mm)
Nozzle Location6 1/2 in. (165 mm) inside from outside edge
Tank Operating Pressure225 psi (15.5 bar)
Valve Torque12.5 ft-lb (16.9 Nm)

Frequently asked questions

How often must maintenance be conducted?

Maintenance must be conducted at six-month intervals, or earlier if the situation dictates.

What is required for a twelve-year maintenance check?

Twelve-year maintenance must include agent tank hydrostatic testing.

Who is authorized to recharge the system?

Those responsible for recharge must be trained and hold a current Pyro-Chem certificate in a Kitchen Knight II training program.

Download PDF (2.1 MB)