US Air Force AN/URC-119(V) HF Communications System Training Standard

This document is the training requirement standard for AN/URC-119(V) HF communication system, including training tasks and contents.


US Air Force AN/URC-119(V) HF Communications System Training Standard - cover page
Brand
US Air Force
Category
Other
Document type
Other
Language
English
Pages
130
File format
PDF
File size
601 KB
Published
15 October, 2023
Updated
15 October, 2023
MD5 checksum
DA481BDFA3BC3A153A7855A53FA142CF

About this manual

This document serves as the Air Force Job Qualification Standard (AFJQS) and associated Training Package (AFQTP) for the AN/URC-119(V) HF Communications System. It standardizes on-the-job training (OJT) tasks for Ground Radio Communications Journeyman/Craftsman personnel.

The standard details specific operational, maintenance, and alignment tasks required for certification, including the operation of the RT-1446 transceiver, C-11329 remote control unit, CU-2310 antenna coupler, and AM-7223/7224 linear power amplifiers. It also provides a structured format for tracking trainee progress and trainer certification.

What's inside

  • General
  • Documentation
  • Equipment Operation
  • Preventive Maintenance Inspections
  • Isolate Faults
  • RT-1446 Alignments
  • C-11329 Alignments
  • AM-7223 LPA Alignments
  • AM-7224 LPA Alignments
  • Certification

Frequently asked questions

What is the minimum inspection interval for the AN/URC-119(V) HF Communications System?

The system requires a 56-day inspection.

What is the minimum inspection interval for the AN/URC-119(V) HF Communications System?

The system requires a 168-day inspection.

What is the minimum inspection interval for the AN/URC-119(V) HF Communications System?

The system requires a 336-day inspection.

Download PDF (601 KB)